2024
- Snowmelt boiler was replaced
- Pool fence was replaced
- Pool was re-tiled
- Elevator hydraulic fluid was replaced
- Repaired elevator emergency system
- East hot tub heat exchange was replaced
- New bollards put in garage
- Interior stairwells were re-painted
- Trash room was re-painted
- Unit doors and windowsills were touched-up
- New lounger cushions for pool area
- Sound dampener installed in sprinkler room
- Gutters were repaired
2023
-
Hot tubs were replastered and tiled
-
Replaced pool furniture
-
Purchased two new firepit areas
-
Replaced pool lights
-
Installed cameras in garage
-
Replaced pool fence
-
Replaced packing in west elevator
-
Planted new garden behind hot tubs
-
Replaced exterior stairwell lights
-
Replaced pool sand filter
-
Replaced hot tub furnace
-
Repaired south sprinkler system
-
Repaired drainage in garage
-
Repaired heat tape in Phase 2
-
Replaced carpeting in elevator cabs and landings
-
Pressure washed and re-striped garage
-
Replaced hot tub covers and pool cover reel
-
New flower planters above entrance driveway
-
Aphid infestation was successfully remedied
-
Unit fireplace thermostats were replaced with timers
-
Created new HOA website
-
Created new phone system
2022
-
Replaced dry fire sprinkler system for garage
-
Installed new back flow system
-
Exterior building repairs completed around tall dining room windows
-
Ceiling repairs in housekeeping closet completed
-
Trees removed by hot tubs and center pool entrance
-
Created mail/package room
-
New pool pump assembly installed
-
Vibration monitors installed in garage
-
Snow melt system repaired
-
Replaced east elevator motherboard
-
Installed well for watering at north end of building
-
Repaired center easement stairs
2021
-
Repainted building
-
Repaired and repainted railings
-
Replaced outdoor carpeting
-
Installed new unit doors and hardware
-
Replaced heat tape in garage and repainted garage ceiling
-
Flower boxes – purchased, primed, painted and decorated
-
Installed hand sanitizer dispensers on every floor and in garage by elevators
-
Resolved/repaired east elevator grounding issue
-
Repaired drainage piping and floor near unit 104
-
Upgraded lighting in storage and maintenance areas with LED
-
Made concrete repairs on balconies and garage area
-
Installed 450 snow clips
2020
-
Phase 1 heat tape replaced in garage
-
Pool and Spa Major Repairs
-
Pool and hot tub crushed pipes were excavated and repaired
-
Snowmelt system was drained and repaired
-
Electrical system for pool lights was rewired
-
Pool circulatory pipes were replaced
-
Hot tub motor was replaced
-
Pool room electrical outlets replaced to be GFCI compliant
-
Pool room flow meters were replaced
-
Hot tub emergency shutoff buttons replaced
-
-
Installed flower boxes along interior walkways
-
Replaced roof clips on southwest side of building
-
Dry fire sprinkler repairs identified during regular inspection were made
-
Replaced all GFCI outlets in garage
-
Replaced drains by Unit 104 and repaired floor to resolve standing water and flooding issues
-
Replaced existing laundry equipment and installed 5 new washers and dryers with electronic payment devices and laundry app
-
Installed hand sanitizer dispensers on all floors by elevators
2019
-
Pool changing rooms and bathroom renovation
-
West elevator traveling cable replace and new heater installed
-
West elevator motor replaced
-
New circuit panel in west laundry room
-
New circuit panel behind office
-
East hot tub motor, jet pump and sensor were replaced
-
New hot tub covers
-
Pool furnace circuit panel that has been repaired
-
Pool circulator pump replaced
-
South lawn irrigation complete after parking lot tear-down
-
New courtyard furniture
-
New pool & garage signage
2018
-
Garage renovation
-
Refaced ski lockers
-
Replaced old wood with hardie-board
-
Garage painting – walls and ceiling
-
New ceiling tiles in elevator landings
-
Cleaned and restriped garage floor
-
New ADA ramp at west elevator
-
Replaced lighting with LED
-
New signage
-
Installed LED lighting in elevators, laundry rooms, office, and maintenance shop
-
Motion sensors installed in laundry rooms and changing rooms
-
Renovated both laundry rooms
-
New flooring
-
Painted
-
Updated plumbing
-
New folding tables and garment racks
-
-
New carpeting in both elevators and garage level landings
-
New southeast irrigation
-
New pool furnace
-
New pool loungers, tables and umbrellas
-
New unit signage on each floor by west elevator
2017
-
New carpeting in both elevators and garage level landings
-
Comcast Xfinity bulk account
-
New signage in garage
-
New gutters on east stone veneer
-
Snow clips above 113-116
-
New gutter and heat tape above 602-604 area
-
New south area garden
-
New lighting on the south sidewalk
-
New hot tub covers
-
Exterior stairwells were resurfaced
-
Interior stairwells lighting was replaced with LED lighting
-
New flower company – Dragonfly Gardening
-
New keyless entry hardware on all unit doors
2016
-
Stone Veneer on East and South sides of Vantage Point-Vail
-
Renovated office
-
New bike racks that are removed during ski season to create more parking spaces
-
Three new luggage carts
-
Electric car charging station
-
Unit door hardware updating
-
Consistency throughout building
-
Security
-
-
Pool & hot tubs are up to code with safety equipment
-
Replaced fluorescent lighting with LED outside the unit doors
-
Stairwell lights are being replaced with LED lighting when they burn out
-
New signage for the office and west laundry door
-
Elevator signage is now up to code and new matts were installed
-
Stairwells were pressure washed
-
New drain and replacement of existing drains on 1st floor SE stairwell that were full of silt
-
New carpeting in both elevators and garage level landings
2015
-
Installed new entrance sign
-
Installed pet station
-
Office remodeled
2014
-
Painted exterior of building and railings
-
Resurfaced the decking
-
Refurbished both spa
-
Installed 9 new lamp post light fixtures throughout the properties
-
Replaced old timbers with a boulder retaining wall
-
Replaced all common door hardware with ADA compliant hardware
2013
-
Phase I elevator replaced
2012
-
Replaced all outdated smoke/heat detectors in all units that were older than 10 years
-
Installed speed bumps in garage
2011
-
Phase II elevator upgraded and renovated
-
Building cable was rewired
-
Replaced concrete walkway ramp on the south side of building
-
Repaired concrete walkway “T”s in Phase II
-
Completed major repairs to east spa
2010
-
Painted exterior building including garage and garage ceiling
-
Replaced garage lighting with new fixtures
-
Upgraded the fire alarm system with a new control panel and unit detectors
2009
-
Installed carbon-monoxide detectors in all units
-
Repaired cracked walls in garage
-
Both laundry rooms flooring was replaced and hung ceilings installed
-
Replaced asphalt paving in the south side of garage
-
Constructed the dumpster enclosure room
2008
-
Replaced 350 feet of gutters
-
Resealed and top coated three common deck areas
-
Repaired concrete in the garage
-
Insulated Phase II garage ceiling
2007
-
Seal coated all three exterior stairwells
-
Renovated chimney stacks
-
Refurbished both elevators
2006
-
Exterminated bat infestation
2005
-
Repainted exterior of building
-
Installed new exterior railings
-
Re-carpeted all exterior walkways
-
New exterior lighting
2004
-
Resealed and top coated 1st floor and walkway
-
Repaired Phase I garage floor
2003
-
Replaced roof on building
-
Pool area was renovated
-
Re-carpeted office
2002
-
Connected Phase I storm drain to the Town of Vail’s storm drain system
1999
-
Plumbed building with natural gas for fireplaces and grills
-
Waterproofed exterior wall down to the footings in Phase II
1998
-
Painted exterior of building
-
Waterproofed and top coated common deck
1997
-
Re-carpeted Phase I walkways
1996
-
Replaced entrance driveway
1995
-
Re-carpeted Phase II walkways
1994
-
Painted exterior of building
-
Replaced exit driveway
1992
-
Repaired major leak in swimming pool
1990
-
Painted exterior of building
-
Topcoat and re-sealed first floor deck and walkway
1987
-
Installed enclosed stairwell emergency lighting
-
Major pool area renovation included two spas, new mechanical room and changing rooms and bather
1986
-
Repaired deteriorating fascia board on walkways
1985
-
Painted exterior of building
-
New signage for Vantage Point-Vail exterior
1984
-
Installed fire alarm system in building for heat and smoke detection and pull boxes
1981
-
Remodeled the storage area in garage from storage to office rental space
1980
-
Installed new wood shake shingle roof
-
Installed lawn sprinkler system on property
1979
-
Landscaped 80% of the property including trees, timber wall beds, sod, flower beds, etc.